Mechanical
Construction
We
are pleased to introduce our Company, which is one of the leading
companies in Pakistan for Mechanical, Maintenance, Fabrication,
Welding and Erection jobs etc. and has been incepted to undertake
the following since 1977:
FABRICATION,
WELDING, ERECTION & MAINTENANCE OF:
-
HIGH
PRESSURE PIPINGS
-
PRESSURE
VESSELS
-
HEAT
EXCHANGERS
-
INDUSTRIAL
BOLILERS INCLUDING PRESSURE & NON-PRESSURE PARTS
-
FURNACE
AND HEATER TUBES
-
VESSELS
AND STORAGE TANKS
-
OTHER MECHANICAL COMPONENTS
-
ALL
TYPES OF STEEL STRUCTURE WORKS
-
INDUSTRIAL
PLANT EQUIPMENTS
-
SKILLED
MANPOWER SUPPLY
Our
Company is capable to undertake any one or all of the above
mentioned jobs and has wide range of experience of similar works
at large number of projects and running plants during shut-down
such as,
-
Fertilizer
Plants,
-
Refineries,
-
Hydel
/
Thermal
Power Stations,
-
Oil
& Gas Installations,
-
Chemicals
Plants,
-
Edible
Oil Plants and Solvent Extractors,
-
Cross
Country High Pressure Pipelines,
-
Cement
Engineering Workshops,
-
Food
Processing Units,
-
Polyester
Plants,
-
River
Barrage/Dam Projects,
we
have already provided our services at the following plants:
-
Pak-Saudi
Fertilizer Company Ltd at Mirpur Mathelo.
-
Fauji
Fertilizer Co. at Goth Machhi.
-
Pakistan Petroleum Limited at Sui field.
-
Engro
Chemicals Pakistan Limited, Daharki,
-
ICI
Polyester Limited, Sheikhupura,
-
WAPDA
Gas Turbine Power Station Extension Project at Kotri,
-
Industrial
Adhesives Limited at Sheikhupura,
-
Pakistan
Oil Field Limited at Khaur,
-
Pak-American
Fertilizers Limited, Daudkhel
-
Attock
Refinery Limited, Morgah, Rawalpind,
-
ABB
Vetco Gray Singapore at PPL Adhi Field, etc.
We
have available with us all desired tools, equipments, machinery
along with qualified, well trained and rich experienced Engineers,
Supervisors and high skilled Technicians, which play an important
role in performing / achieving the targets assigned to them.
PROJECTS
EXECUTED
MECHANICAL
CONSTRUCTION AND ERECTION JOBS
PAKSAUDI
FERTILIZERS LIMITED.
MIRPUR
MATHELO-DISTRICT GHOTKI (SINDH)
A PLANT OF NATIONAL FERTILIZER CORPORATION (NFC)
1.1
Fabrication and laying of fire fighting and cooling water lines ุ
ranging
between 6 thru
36 before erection of main plant of Paksaudi Fertilizer.
1
.2
Services
for Pre-fabrication and erection of plant piping of ammonia/urea
plant
at Mirpur Mathelo, including welding, erection of Boiler, Furnace
and utilities piping, during
the construction of Paksaudi Fertilizer Ltd. in
association with the
consortium of M/s. MAB-INVENTAญMAN.
1
.3
Annual
plant maintenance and modification jobs during turnarounds
since 1985. We were specially
awarded the contract for replacement
of bends of auxiliary boilers
which involved gas cutting of old
bends, fabrication/welding of
new bends and Hydro Pressure Testing of
Boiler during turnarounds in
1987 and 1989 including insulation and
refractory works.
1.4 Repair
of coat wrap of gas line at different points between Man Gas Field
to
PSFL premises about nine kilometer long and 16 diameter.
1.5 During September
October 1991 plant turnaround following major
Fabrication,
Welding and Mechanical jobs were successfully executed by
us:
1.5.1
Reinforcement
by means of padding/welding of
damaged portion of 120
meters high BLOW DOWN VENT
STACK
ME-121 0 40 at elevation ranging from 20 meters to
100 meters
using specially fabricated
lift by ourselves including designing and
abrication of special winch
cradle at the top of area, removal,
prefabrication, welding and
erection of all damaged pipelines of 0 8,lO
and 12 connecting
to main blow down, their reญfabrication, erection
and
welding.
1.5.2 Repair
of internal S.S. lining and sieve trays of Urea Reactor
R-101
including grinding of 32 circumferential welds of ุ 2.31 meter
each and
longitudinal welds of this vessel having 45 meter height
to remove the
contaminated welding
and re-welding of all grinded
circumferential/longitudinal seams.
1.5.3 Removal
of damaged internal lining and cutting, rolling fabrication and
welding of new Al SI 31
6L internal lining sheets of columns Cญ101,
C-102,
repair of V-lOS Vessel which involved cutting, fabrication
and
welding
of two 33 mm thick. hemispherical heads which were 100%
radiographed.
1.5.4
Repair
of Ben field solution regenerator C-301 and absorber C-302.
1.5.5 Replacement
of fixed tube bundle of waste heat boiler, E-208A at
Paksaudi
Fertilizer, Mirpur Mathelo during the year 1997.
1.5.6 Replacement
of Primary Reformer Tubes (Fญ201). JIA000 had
successfully
completed the replacement of 80 Nos. of Primary Reformer
Tubes in 1995 and the balance 80 Tubes in 1999.
1.5.7 Replacement
of EVAPORATER RISER Tube Bends of Boiler B-602:
Replacement of
complete set of 76 Nos. Evaporator Riser Tube and
Bends were
carried by us. The job scope were cutting of Tubes and
Bends prefabrication and welding of New Bends with 100%
Radiography
FAUJI
FERTILIZER CO. LIMITED - GOTH MACHHI
2.1
Fabrication,
erection and welding of storage tanks such as T-1101, liquid
ammonia storage tank T-650 diesel storage tank, T-901 dim-increalized water tank, T-902 dami water tank,
reactivator,
beneficial solution storage tank and F-201 Furnace stack during
construction of this ammonia urea complex.
2.2
Services
for prefabrication and erection of plant piping diameter ranging
from 1to 60 including erection of structure etc. in
association with M/s. Aquater Sp.a. (an Italian concern) during
installation of this fertilizer plant.
2.3
We are registered Mechanical Contractors and have been
executing
mechanical
Maintenance, Modification and Welding jobs during all
annual turnarounds
of the said plant since its coming into production
from 1982-83.
2.4
Provided services for Welding jobs on structure and
piping using
electric and
Argon welding techniques as per approved welds
procedure during
the years 1998 to 2002.
PAKISTAN
PETROLEUM LIMITED - SUI FIELD.
3.1
Have been undertaking Inspection/Fabrication and welding of
gas
gathering lines,
well head surface fittings and other miscellaneous
jobs at this gas
field of Pakistan Petroleum Limited, situated at Sui in
Baluchistan
Province.
EXXON
CHEMICALS PAKISTAN LIMITED (ENGRO
CHEMICALS)
DAHARKI, DISTT: GHOTK1
4.1
Executed fabrication and erection of ducting for prilling
tower
blower of this
fertilizer plant in 1980.
4.2
Carried out repair and maintenance jobs in ammonia plant
reforming
section, CIA/B
motors, GT-601i602 generator and E-17B
exchanger at
Exxon Chemicals Pakistan Limited, Daharki in the year
1981.
4.3
Carried out fabrication, welding of
high-pressure pipelines.
4.4
In addition to above we have successfully execut following
welding
and mechanicals
jobs during different annual plant turnarounds of
Exxon Chemicals:
4.4.1
Repair of refractory lining of F-i outlet pigtail stub
ends.
4.4.2
Gusseting for small ุ pipe connection
4.4.3
Inspection and repair of F-I stack welds.
4.4.4
Fabrication of 6 ุ TK-4 line to pumps.
4.4.5
Louver deck inspection and repair.
4.4.6
Recently provided welding, radiography and inspection
services
during annual turnarounds of Engro Chemicals Daharki in March -
April
2000,
April 2001, October - November 2002 and March - April- 2004.
ICI
PAKISTAN MANUFACTURERS LIMITED - SHEIKHUPURA
5.1
Completed
fabrication, Welding, Coating, Wrapping and laying of 10 ุ
fire fighting pipeline during polyester extension project.
5.2
Re-routing of firewater pipeline in polymer plant.
5.3
Successfully provided technical services to ICI during
polymer plant
shut down in September -
October 1986, October - November 1989,
February 1992 and June
1993.
WAPDA
- GAS TURBINE POWER STATION EXTENSION PROJECT - KOTR1
6.1
Completed under turn key basis including incomplete design,
all material
supply, all civil
works foundations, fabrication, welding and testing of
fuel oil storage tank
allied piping and pumping station to GTPS Kotri
project according to
entire satisfaction of WAPDA Project Authorities
INDUSTRIAL
ADHESIVES LIMITED
7.1
Complete designing of local
fabrication
and electrification
including electronic
parts.
7.2
Erection, installation and start-up to the entire
satisfaction of their
Japanese
Consultants.
NATIONAL
REFINERY LIMITED.LUBE
OIL EXPANSION PROJECT KORANGI - KARACHI
8.1
Carried out erection and welding of 8 Nos. storage tanks
each having
80 ft dia and 42 ft
height at this Lube Oil Expansion
project in
association with DESCON
Engineering Limited.
SAUDI
ARABIA FERTILIZER CO. (SAFCO) SAUDI ARABIA
9.1
Carried out different maintenance jobs on turn key basis
during their
annual turnaround.
PAKISTAN
OIL FIELD LIMITED-KHOUR DISTRICT: ATTOCK
10.1
Successfully executed following welding,
fabrication jobs at Oil Field of
P.O.L. in
District Attock:
10.1.1
Welding of dia 2 gas pipeline of gas lift for POL # 7 at
Meyal Oil Field
during the year 198687.
10.1.2
Welding of high-pressure expansion bends and exchanger
tubes,
during the year 1988 at Khaur POL Workshop.
10.1.3
Welding for 2 0 schedule 80 piping for Meyal well No.
10.
10.1.4
Welding of Heat exchangers and exhaust ducts in 1989.
10.1.5
Welding of Heat exchanger tubes for Meyal S.P. Plants, in
1990.
10.1.6
Welding of Pipeline at Meyal Oil Field and Heat exchanger
tubes at
Khaur
POL Workshop in 1991
10.1.7
Welding of boiler tubes at POL Khaur Workshop in October -
December-1991.
10.1.8
Welding and laying of 4 ุ 12 K.M. and 6 ุ 20 K.M.
Oil pipeline in
1994
95.
PAK-AMERICAN
FERTILIZER LIMITED - DAUDKHEL
11
.1
Specially
awarded and successfully completed the installation, welding
and testing
of super heater tubes of MES boiler of Pak-American
Fertilizer
a unit of National Fertilizer Corporation (NFC) job included as
under:
11.1
.1
Welding and
fabrication of 340 Super heater tubes 45 mm dia.
11
.1 .2
Welding and fabrication of 140 joints of water wall tubes
76 mm dia.
11
.1 .3
Welding and fabrication of 1 78 Nos. spacer supports.
11
.1 .4
Alignment/welding of supports and tubes including stubs
whereve
applicable.
11
.1 .5
Radiographic Inspection and Hydraulic test.
11
.1 .6
Insulation and box up.
11
.1.7
Re-tubing which involved welding and fabrication of two
Nos.
surface condensers, having 2496 tubes in each condenser during the
year 1994.
ATTOCK
REFINERY
LIMITED
-
RAWALINDI
(FROM SEPTEMBER 1986 TO FEBRUARY 2005)
12.1
Replacement of crude charge heater tubes at this refinery
including:
12.1.1
Scaffolding on ground to cover height of about 20 ft
to 70 ft.
12.1.2
Opening
of heater body plates and removal of insulation.
1
2.1.3
Cutting of old tubes from bends/flanges.
12.1.4
Pre-fabrication of new tubes to size, beveling and cleaning etc.
12.1.5
Placing of new tubes by crane (88 Nos. having 4 and 5
diameter
schedule 40 and 80 including 16 Nos. tubes of P5 material).
12.1.6
Fitting and welding of tubes as per qualified
and approved welding
procedure.
12.1.7
Dye-Penetrant of root pass and 100%
Radiography of Completed
joints
12.1.8
Pre-Heating and PWHT of 32 joints of P-S Tubes and
hardness
testing.12.1.9
Hydraulic pressure test of the tubes.
12.1.10
Re-insulation and installation of heater body plates.
12.1.11
Replacement of heater tubes at HBU It during January
2002.
12.1.12
Replacement of heater tubes at HBU I
during July 2002.
12.1.13
Replacement of heater tubes at HBU 5000 During February
2005.
ORIENT
PETROLEUM INC. (DHURNOL OIL FIELD)
13.1
Carried
out fabrication, welding, radiographic testing and post weld
heat
treatment of following pipelines at Dhurnol Oil Field:
13.1.1
V-102 Inlet/Plant Lines ุ
6 and ุ
10
13.1.2
Flour Lines/Plant Lines ุ
6 schedule 40.
ABG
PAKISTAN (PVT) LTD.
14.1
Welding
and Radiographic Testing of 30 x 0.75 wall thickness pipes
with 30 x 0.75
R type connectors 24 Nos. as per API 1104
approved by PPL and ABB
Vetco Gray Singapore, carried out at PPL Adhi
Field.
14.2
Welding of lifting pad and landing shoe for connectors at
PPL Adhi Field
- Chakwal site area.
|