Mechanical Construction

We are pleased to introduce our Company, which is one of the leading companies in Pakistan for Mechanical, Maintenance, Fabrication, Welding and Erection jobs etc. and has been incepted to undertake the following since 1977:
FABRICATION, WELDING, ERECTION & MAINTENANCE OF:

  • HIGH PRESSURE PIPINGS

  • PRESSURE VESSELS

  • HEAT EXCHANGERS

  • INDUSTRIAL BOLILERS INCLUDING PRESSURE & NON-PRESSURE PARTS

  • FURNACE AND HEATER TUBES

  • VESSELS AND STORAGE TANKS

  • OTHER MECHANICAL COMPONENTS

  • ALL TYPES OF STEEL STRUCTURE WORKS

  • INDUSTRIAL PLANT EQUIPMENTS

  • SKILLED MANPOWER SUPPLY

Our Company is capable to undertake any one or all of the above mentioned jobs and has wide range of experience of similar works at large number of projects and running plants during shut-down such as,

  • Fertilizer Plants,

  • Refineries,

  • Hydel / Thermal Power Stations,

  • Oil & Gas Installations,

  • Chemicals Plants,

  • Edible Oil Plants and Solvent Extractors,

  • Cross Country High Pressure Pipelines,

  • Cement Engineering Workshops,

  • Food Processing Units,

  • Polyester Plants,

  • River Barrage/Dam Projects,

we have already provided our services at the following plants:

  • Pak-Saudi Fertilizer Company Ltd at Mirpur Mathelo.

  • Fauji Fertilizer Co. at Goth Machhi.

  • Pakistan Petroleum Limited at Sui field.

  • Engro Chemicals Pakistan Limited, Daharki,

  • ICI Polyester Limited, Sheikhupura,

  • WAPDA — Gas Turbine Power Station Extension Project at Kotri,

  • Industrial Adhesives Limited at Sheikhupura,

  • Pakistan Oil Field Limited at Khaur,

  • Pak-American Fertilizers Limited, Daudkhel

  • Attock Refinery Limited, Morgah, Rawalpind,

  • ABB Vetco Gray Singapore at PPL Adhi Field, etc.

We have available with us all desired tools, equipments, machinery along with qualified, well trained and rich experienced Engineers, Supervisors and high skilled Technicians, which play an important role in performing / achieving the targets assigned to them.

PROJECTS EXECUTED

MECHANICAL CONSTRUCTION AND ERECTION JOBS

PAKSAUDI FERTILIZERS LIMITED.

MIRPUR MATHELO-DISTRICT GHOTKI (SINDH)
A PLANT OF NATIONAL FERTILIZER CORPORATION (NFC)

1.1   Fabrication and laying of fire fighting and cooling water lines ุ  ranging
       between 6” thru 36” before erection of main plant of Paksaudi Fertilizer.  
1 .2 Services for Pre-fabrication and erection of plant piping of ammonia/urea
       plant at Mirpur Mathelo, including welding, erection of Boiler, Furnace
       and utilities piping, during the construction of Paksaudi Fertilizer Ltd. in
       association with the consortium of M/s. MAB-INVENTAญMAN.
1 .3  Annual plant maintenance and modification jobs during turnarounds
       since 1985. We were specially awarded the contract for replacement
       of bends of auxiliary boilers which involved gas cutting of old
       bends, fabrication/welding of new bends and Hydro Pressure Testing of
       Boiler during turnarounds in 1987 and 1989 including insulation and  
       refractory works.

1.4 Repair of coat wrap of gas line at different points between Man Gas Field
      to PSFL premises about nine kilometer long and 16” diameter.
1.5
During September — October 1991 plant turnaround following major
     
Fabrication, Welding and Mechanical jobs were successfully executed by
      us:
1.5.1 Reinforcement by means of padding/welding of
        damaged portion of 120 meters high BLOW DOWN VENT
        STACK ME-121 0 40” at elevation ranging from 20 meters to 100 meters
        using specially fabricated lift by ourselves including designing and
        abrication of special winch cradle at the top of area, removal,
        prefabrication, welding and erection of all damaged pipelines of 0 8”,lO”
        and 12” connecting to main blow down, their reญfabrication, erection
        and welding.
1.5.2 Repair of internal S.S. lining and sieve trays of Urea Reactor R-101 
        including grinding of 32 circumferential welds of ุ 2.31 meter each and 

        longitudinal welds of this vessel having 45 meter height to remove the 
        contaminated welding and re-welding of all grinded 
        circumferential/longitudinal seams. 

1.5.3 Removal of damaged internal lining and cutting, rolling fabrication and
        welding of new Al SI 31 6L internal lining sheets of columns Cญ101, 

        C-102, repair of V-lOS Vessel which involved cutting, fabrication and 
        welding of two 33 mm thick. hemispherical heads which were 100% 
        radiographed.
1.5.4 Repair of Ben field solution regenerator C-301 and absorber C-302.
1.5.5 Replacement of fixed tube bundle of waste heat boiler, E-208A at 
        Paksaudi Fertilizer, Mirpur Mathelo during the year 1997.
1.5.6 Replacement of Primary Reformer Tubes (Fญ201). JIA000 had 
        successfully  completed the replacement of 80 Nos. of Primary Reformer
        Tubes in 1995 and the balance 80 Tubes in 1999.
1.5.7 Replacement of EVAPORATER RISER Tube Bends of Boiler B-602: 
        Replacement of complete set of 76 Nos. Evaporator Riser Tube and 
        Bends were carried by us. The job scope were cutting of Tubes and 
        Bends prefabrication and welding of New Bends with 100% Radiography

FAUJI FERTILIZER CO. LIMITED - GOTH MACHHI

2.1    Fabrication, erection and welding of storage tanks such as T-1101, liquid ammonia storage tank T-650 diesel storage tank, T-901 dim-increalized water tank, T-902 dami water tank, reactivator, beneficial solution storage tank and F-201 Furnace stack during construction of this ammonia urea complex.

2.2    Services for prefabrication and erection of plant piping diameter ranging from 1”to 60” including erection of structure etc. in association with M/s. Aquater Sp.a. (an Italian concern) during installation of this fertilizer plant.

2.3     We are registered Mechanical Contractors and have been executing
         mechanical Maintenance, Modification and Welding jobs during all
         annual turnarounds of the said plant since its coming into production
         from 1982-83.
2.4    Provided services for Welding jobs on structure and piping using
         electric and Argon welding techniques as per approved welds
         procedure during the years 1998 to 2002.

PAKISTAN PETROLEUM LIMITED - SUI FIELD.

3.1    Have been undertaking Inspection/Fabrication and welding of gas
         gathering lines, well head surface fittings and other miscellaneous
         jobs at this gas field of Pakistan Petroleum Limited, situated at Sui in
         Baluchistan Province.

         EXXON CHEMICALS PAKISTAN LIMITED (ENGRO                 CHEMICALS) DAHARKI, DISTT: GHOTK1

4.1    Executed fabrication and erection of ducting for prilling tower
         blower of this fertilizer plant in 1980.

4.2    Carried out repair and maintenance jobs in ammonia plant reforming 
         section, CIA/B motors, GT-601i’602 generator and E-17B
         exchanger at Exxon Chemicals Pakistan Limited, Daharki in the year
         1981.

4.3   Carried out fabrication, welding of high-pressure pipelines.

4.4    In addition to above we have successfully execut following welding
         and mechanicals jobs during different annual plant turnarounds of
         Exxon Chemicals:

4.4.1   Repair of refractory lining of F-i outlet pigtail stub ends.

4.4.2   Gusseting for small ุ pipe connection

4.4.3   Inspection and repair of F-I stack welds.

4.4.4   Fabrication of 6” ุ TK-4 line to pumps.

4.4.5   Louver deck inspection and repair.

4.4.6   Recently provided welding, radiography and inspection services
           during annual turnarounds of Engro Chemicals Daharki in March - April
           2000, April 2001, October - November 2002 and March - April- 2004.

ICI PAKISTAN MANUFACTURERS LIMITED - SHEIKHUPURA

5.1   Completed fabrication, Welding, Coating, Wrapping and laying of 10” ุ fire fighting pipeline during polyester extension project.

5.2   Re-routing of firewater pipeline in polymer plant.

5.3    Successfully provided technical services to ICI during polymer plant
        shut down in September - October 1986, October - November 1989,
        February 1992 and June 1993.

WAPDA - GAS TURBINE POWER STATION EXTENSION PROJECT - KOTR1

6.1  Completed under turn key basis including incomplete design, all material
      supply, all civil works foundations, fabrication, welding and testing of
      fuel oil storage tank allied piping and pumping station to GTPS Kotri
      project according to entire satisfaction of WAPDA Project Authorities

INDUSTRIAL ADHESIVES LIMITED

7.1   Complete designing of  local fabrication and electrification
        including electronic parts.

7.2    Erection, installation and start-up to the entire satisfaction of their
         Japanese Consultants.

NATIONAL REFINERY LIMITED.LUBE OIL EXPANSION PROJECT KORANGI - KARACHI

8.1    Carried out erection and welding of 8 Nos. storage tanks each having
        80 ft dia and 42 ft height at this Lube
Oil Expansion project in
        association with DESCON Engineering Limited.

SAUDI ARABIA FERTILIZER CO. (SAFCO) SAUDI ARABIA

9.1    Carried out different maintenance jobs on turn key basis during their
        annual turnaround.

PAKISTAN OIL FIELD LIMITED-KHOUR DISTRICT: ATTOCK

10.1   Successfully executed following welding, fabrication jobs at Oil Field of
         P.O.L. in District Attock:

10.1.1  Welding of dia 2” gas pipeline of gas lift for POL # 7 at Meyal Oil Field
            during the year 1986—87.

10.1.2  Welding of high-pressure expansion bends and exchanger tubes,
           during the year 1988 at Khaur POL Workshop.

10.1.3 Welding for 2” 0 schedule 80 piping for Meyal well No. 10.

10.1.4  Welding of Heat exchangers and exhaust ducts in 1989.

10.1.5  Welding of Heat exchanger tubes for Meyal S.P. Plants, in 1990.

10.1.6  Welding of Pipeline at Meyal Oil Field and Heat exchanger tubes at
           Khaur POL Workshop in 1991

10.1.7  Welding of boiler tubes at POL Khaur Workshop in October -
           December-
1991.

10.1.8  Welding and laying of 4” ุ 12 K.M. and 6” ุ 20 K.M. Oil pipeline in
          1994 — 95.

PAK-AMERICAN FERTILIZER LIMITED - DAUDKHEL

11 .1   Specially awarded and successfully completed the installation, welding
          and testing of super heater tubes of MES boiler of Pak-American
          Fertilizer a unit of National Fertilizer Corporation (NFC) job included as
          under:

11.1 .1   Welding and fabrication of 340 Super heater tubes 45 mm dia.

11 .1 .2  Welding and fabrication of 140 joints of water wall tubes 76 mm dia.

11 .1 .3  Welding and fabrication of 1 78 Nos. spacer supports.

11 .1 .4  Alignment/welding of supports and tubes including stubs whereve
applicable.

11 .1 .5  Radiographic Inspection and Hydraulic test.

11 .1 .6  Insulation and box up.

11 .1.7   Re-tubing which involved welding and fabrication of two Nos.
            surface condensers, having 2496 tubes in each condenser during the
            year 1994.

ATTOCK REFINERY LIMITED - RAWALINDI (FROM SEPTEMBER 1986 TO FEBRUARY 2005)

12.1 Replacement of crude charge heater tubes at this refinery including:

12.1.1    Scaffolding on ground to cover height of about 20 ft to 70 ft.
12.1.2    Opening of heater body plates and removal of insulation.
1 2.1.3   Cutting of old tubes from bends/flanges.
12.1.4    Pre-fabrication of new tubes to size, beveling and cleaning etc.
12.1.5    Placing of new tubes by crane (88 Nos. having 4” and 5” diameter
             schedule 40 and 80 including 16 Nos. tubes of P5 material).
12.1.6    Fitting and welding of tubes as per qualified and approved welding
            procedure.
12.1.7    Dye-Penetrant of root pass and 100% Radiography of Completed
            joints
12.1.8   Pre-Heating and PWHT of 32 joints of P-S Tubes and hardness
           testing.12.1.9    Hydraulic pressure test of the tubes.
12.1.10  Re-insulation and installation of heater body plates.
12.1.11  Replacement of heater tubes at HBU — It during January — 2002.
12.1.12  Replacement of heater tubes at HBU — I during July — 2002.
12.1.13  Replacement of heater tubes at HBU — 5000 During February 2005.

ORIENT PETROLEUM INC. (DHURNOL OIL FIELD)

13.1    Carried out fabrication, welding, radiographic testing and post weld
          heat treatment of following pipelines at Dhurnol Oil Field:
13.1.1 V-102 Inlet/Plant Lines 6” and 10”
13.1.2  Flour Lines/Plant Lines 6” schedule 40.

ABG PAKISTAN (PVT) LTD.

14.1  Welding and Radiographic Testing of 30” x 0.75” wall thickness pipes
        with 30” x 0.75” “R” type connectors 24 Nos. as per API 1104
        approved by PPL and ABB Vetco Gray Singapore, carried out at PPL Adhi
        Field.
14.2  Welding of lifting pad and landing shoe for connectors at PPL Adhi Field
        - Chakwal site area.